Universe: Interrogative Spaces

iconuniverse14

In my previous post I gave thought to Tim Brown of IDEO’s “design thinking”, Clayton Christensen’s “Innovator’s Dilemma”, Malcolm Gladwell’s “Tipping Point”, and Buckminster Fuller’s “Synergetics” concepts.  What emerged was the above Czerepak Framework.  My claim is this framework is fundamental to designing a system.

The thing that the above table shows is interaction within what I am now going to call the “Interrogative Spaces”: HowSpace, WhatSpace, WhySpace, WhoSpace, WhenSpace, WhereSpace, HowMuchSpace, HowManySpace.  Each ellipse I call a “vortice”.  The Interrogative Spaces are composed of one or more vortices.  The Framework above shows how Spaces are composed within the Interrogatives,  but what about interactions between the Interrogative Spaces?   A good example is speed or velocity.  Speed is the intersection of WhenSpace and WhereSpace:

v = r / t

Where v is velocity, r is radius and t is time.

If you are increasing Speed, which is acceleration, you have one dimension of WhereSpace and two dimensions of WhenSpace:

a = r / t’ * t”

Where a is acceleration, r is radius, t’ is the first clock and t” is the second clock.  You cannot measure acceleration with one clock. This uniqueness of every vortice applies to all the Interrogative Spaces and all inter-relationships between all of the Spaces.  .

Another way to look at the Interrogative Spaces is as sets and subsets.  The first row are the complete Space vortice sets.  The second row are the first Space vortice subsets.  The third row is the intersect between the row two and row three Space vortice subsets. And the fourth row are the intersects between the row two and row three and row four Space vortice subsets.

I do not believe that anything is constant.  Not the speed of light, not gravity, not cosmology.  Every intersection of dimensions creates a vortex in Universe and every one is unique.  We are simply unable to measure and manage the uniqueness of everything, therefore we make generalizations which create models that can always be falsified.

Buckminster Fuller: The Billionaires of Spaceship Earth

buckminster-fuller

“Technologically we now have [six billion billionaires] on Spaceship Earth who are entirely unaware of their good fortune.  Unbeknownst to [us our] legacy is being held in probate by general ignorance, fear, selfishness, and a myriad of paralyzing professional, licensing,  zoning, building laws and the like, as bureaucratically maintained by the incumbent power structures.”

— R. Buckminster Fuller, Critical Path

critical-path

I never regarded R. Buckminster Fuller as a true revolutionary until I began reading his final book, Critical Path.  The above quote from the preface clearly summarizes his position:  The people in power are artificially maintaining the poverty of the world.

May this generation pull them and their political structures down.